News Updated: 23-02-2007
|
Antwerp- ExxonMobile- Cargill - Parking Delft - Sit stand Workspace - Controlroom - Belgium Railways - Bank - Parking Dordrecht - Cyber centre - Dow Chemical - Others |
||
![]() |
Five consoles with one
height adjustable central control desk are recently placed in Belgium for
the Antwerp Water Works. This configuration is suitable for 24 monitors.![]() |
|
|
ExxonMobile
Export Furniture for Afrika
|
One small console with three workspaces and two separate workstations are sold to ExxonMobile in Equatorial Guinea. The parts were shipped in one 3 m3 crate and will be assembled in situ by Mobile. |
|
|
|
Twelve small TFT screens are placed at a threefold control desk in a small control room in Belgium. The desk is suited for one or two operators who can manage the whole process at the Cargill plant. |
|
|
|
Five large TFT screens are the eyecatcher of this new control room located in Delft. The control room area was designed and turnkey delivered by us. The 40 inch tft screens are Samsung, the desk is Design4u. More than 40 cameras are surveilling the internal parking lot with over 700 spaces.The control room area is provided with bullet proof windows and walls. |
|
|
|
Ergonomic workspace is needed for everyone, but workers who deal with a lot of screens may need ergonomics even more. The solution for a dynamic ergonomic workspace can be achieved with our new sit/stand module which consists of a large tabletop with independent monitor stand. The electrical adjustment (65-130 cm)of the tabletop and the monitor stand is done with a pair of separate motors and is controled by only one control unit. The workspace is individually controlled and can nevertheless be coupled to a multi desk configuration. |
|
|
|
Through DHV-Eindhoven we were asked to design the new control room of a multi national company in Almelo (The Netherlands). The project was performed in 2003-2004 and the final presentation was on the 25 may 2004. The control room consists of two main rooms divided by a glass wall. The control area itself is build on a leveled floor system and holds five large screen projectors and two consoles with LCD screens. The conference area has facilities for 20 people. We advised the complete technical and non-technical decoration (walls, floors, carpets, chairs, tables, colours, materials, etc.) of the area and the furniture. The specific (wooden) furniture was produced by an external firm. |
|
|
NMBS Belgische Spoorwegen- Belgian Railways
|
The Belgian Railways (NMBS)
asked us to build a prototype for their control centers. The prototype will
be delivered in April 2003. See also our Belgia website: www.design4u.be. TOP |
|
|
|
New controlroom desk placed in a Bank in Leeuwarden (Netherlands). This closed system was filled with 17" flat screens. Used by the ICT department of the Frieslandbank. |
|
|
|
New controlroom desk placed in a Parkinghouse in Dordrecht (Netherlands). This sophisticated system will be fully functional for the 7x24 hours operators and include many ergonomic features. Design4u has designed the complete controlroom of Parking Delft, operational in november 2004. |
|
|
|
We are working on a new high tech desk system for clients in the area of internet services. This sophisticated system will be fully functional for the 7x24 hours operators and include many ergonomic features. |
|
|
|
DOW
Benelux is expanding one of its factory
trains. In two phases (March and June 2002) we will deliver a complete new
desk together with Ergotech.
The desks are adjustable in height and adapted to our newest standards. TOP |
|
|
|
SCV-CV is dubbeling it's alarm control room capacity. Together with Design4U the interior is completed and is operational at this moment.. |
|
| copyright design4u® 2007 all rights reserved |